Case Study
Organization:
Pallas Karting LTD.
Industry:
Leisure
Challenge:
To provide a cost effective solution and increase the life and reliability of a centrifugal clutch drive system.
Solution:
Complete re-design of an existing centrifugal clutch.
Benefits:
Extremely reliable
More cost effective
Integrated greasing system
Less down time
Spare parts easily available.
Preamble: As an innovative solutions provider of excellence in engineering design and development and a turnkey engineering solution provider, MecTec approached this project by discussing all aspects of the challenge with the client. The format and methodology for this process has been developed by MecTec to bring best engineering practice and consistency to all our projects.
The format for this determination is as follows:-
Areas of concern
Areas of improvement
Safety issues
Design issues
Reliability
Solution: It became obvious during the initial process of determining the scope of works that the heat generated from the friction of the clutch shoes played a detrimental effect on the wear of the clutch. MecTec provided a new design of the complete clutch assembly. Materials of different grades and compositions were tested and finally a perfect match was determined. A clutch shoe was designed so as the heat generated actually improved the overall performance of the clutch. With the agreement of Pallas Karting LTD a full test was carried out on their premises using one of their new karts. A new design was drafted and put into production for an integrated greasing system. This new development has increased the overall clutch’s life span and drastically reduced maintenance costs.
Epilogue:
The new design of centrifugal clutch has reduced running costs and down time for Pallas Karting. This has also benefited the racing karts overall performance and reliability having more karts availably for the track.
Michael Maloney manager of Pallas Karting LTD
“MecTec have been a pleasure to deal with and their overall design, development, testing and commitment of this project is second to none. We have finally found a solution in a reliable product in which no other company would consider taking on.”
www.pallaskarting.com